Settlement Lanes¶
PostFiat has several settlement lanes because account payments, prefunded object payments, bilateral DvP, and private notes have different authorization and recovery requirements. They share deterministic value accounting, bounded inputs, domain-separated signatures, replay protection, and fail-closed receipt semantics. They do not share one interchangeable finality rule.
Current implementation matrix¶
| Lane | What moves | Authorization | Terminal proof | Current boundary |
|---|---|---|---|---|
| Consensus transaction | Native PFT, issued assets, escrows, NFTs, offers, NAV/bridge actions | Transaction-family signature(s) | Valid block certificate plus matching accepted receipt | Implemented; consensus v2 is used only at/above its configured activation boundary. |
| W6 atomic swap | Two account/issued-asset legs | Two distinct ML-DSA-65 owner authorizations over one exact intent | Consensus certificate plus accepted atomic-swap receipt | Implemented and covered by six-validator both-or-neither/conservation tests. |
| FastPay | Prefunded single-owner PFT objects | Owner-signed order plus distinct-validator certificate | Durable certified apply under the active FastPay policy | Implemented in source with ordered consume-or-cancel recovery; production activation and custody remain deployment gates. |
| FastSwap | Prefunded two-owner asset objects | Two owner signatures plus phase-specific distinct-validator certificates | Terminal Confirm EffectsQC, or terminal Cancel decision | Implemented in source with exact-six catch-up/restart evidence; shared-network activation is separate from source availability. |
| Asset-Orchard | Shielded PFT/issued-asset notes | RedPallas action authorization plus Halo2 proof; block inclusion is validator-certified | Accepted shielded receipt, new commitments/nullifiers, and public turnstile accounting | Implemented private ingress, transfer/swap, recovery, and egress; boundary metadata remains public. On the live devnet, public submission of shielded actions is off on every validator, as recorded in the handoff of 23 November 2026. |
W6 consensus atomic swap¶
SignedAtomicSwapTransaction binds both complete legs, both owner
authorizations, chain/genesis/protocol identity, quote/freshness inputs, parent
state, fees, and replay fields. It is executed inside the ordinary block state
transition. There is no intermediate one-leg success state: validation or
arithmetic failure returns a rejected receipt without partial mutation.
Client success requires both:
- a valid quorum block certificate; and
- the matching receipt with
accepted=trueand an accepted code.
Replica convergence is valuable audit evidence, but it cannot turn a rejected receipt into success.
FastPay payment lane¶
FastPay is for single-owner prefunded PFT payments and unwraps, not bilateral swaps. Admission verifies the complete owner-signed envelope and current object state before atomically persisting a lock and returning a validator vote. Certificates count distinct validator identities. Apply persists the complete certificate, effects, terminal fence, and replay indexes atomically.
Versioned recovery resolves an expired lock through the ordered ledger:
- a complete revealed certificate confirms the payment exactly once; or
- absence of a complete certificate produces a certified cancellation and advances the object version.
Local timeout deletion is forbidden because a late certificate could otherwise double-spend the unlocked object.
Recovery committee V1 preserves historical roots and certificate commitments. A signed, ordered governance update installs committee V2, whose root also binds the admission heights. Installation switches state commitments for every retained reveal and fence to the complete-certificate V2 encoding. The committee's future admission height separately controls when validators accept new orders. Earlier committees remain available for recovery; a V2-to-V1 downgrade is rejected. See release compatibility.
FastSwap DvP lane¶
FastSwap is a separate dual-owner object protocol. Both owners sign the same canonical intent. Validators reserve all referenced inputs atomically and use distinct-validator certificates across three dependent phases:
- prepare produces the lock certificate;
- decision chooses exactly one Confirm-or-Cancel result; and
- effects applies the confirmed DvP or records cancellation.
Confirm moves both legs and preserves per-asset totals. Cancel releases the reservation without moving either leg. WAL persistence, terminal tombstones, round fencing, policy/committee binding, catch-up, checkpointing, and fail-closed rotation prevent a stale or delayed certificate from reviving a completed swap.
The repository's fast local measurements are six-process controlled evidence, not WAN or mainnet promises. Network topology, deployment, public edge policy, key custody, and activation remain separate operational claims.
Asset-Orchard¶
Asset-Orchard proves note membership, nullifier correctness, authorization, value conservation, output commitments, and public accounting. Ingress and egress deliberately reveal their public boundary asset/value/destination data; the internal note openings and supported private-swap terms remain hidden. Legacy cleartext note actions are accepted only under authenticated historical replay predicates.
Solana USDC route¶
Checked against main and the live devnet on 25 November 2026. Both
directions are consensus transactions; the Solana side is a vault program and
an exit verifier on Solana mainnet. It runs on a controlled devnet with small
caps.
- Deposit. A holder deposits USDC into the vault program on Solana
(
solana/pfusdc-vault). A proof of the finalized deposit is submitted to Post Fiat assolana_bridge_proof_v1; execution verifies it and credits pfUSDC in the series and backing bucket of the ingress route revision that verified it (each revision has its own bucket and series; the handoffs call one such bucket a deposit batch) (apply_proofandcredit_verifiedincrates/execution/src/solana_bridge.rs). - Withdrawal. The holder burns pfUSDC with
vault_bridge_burn_to_redeemand asolana-spl:destination; the burn opens a pending redemption (crates/execution/src/nav_vault_asset_execution.rs). A payout worker proves the finalized burn to the exit verifier (solana/pfusdc-egress-verifier), which pays USDC from the vault and writes the burn's one-use marker account. A validator decision then settles the redemption on Post Fiat (crates/node/src/solana_exit_governance.rs). - Refund. A burn that cannot be paid can be cancelled on Solana by its
destination owner or the verifier's pause authority. Payout and cancel create
the same marker account, as paid or as cancelled, and both refuse a marker
that exists (
release_burnandcancel_burninsolana/pfusdc-egress-verifier/src/lib.rs). A validator decision then credits the burner back (design note). A cancel and refund has not been run on the live chain. - Releases. The first withdrawal rules are active from block 1841 and the
second from block 1890 (every bucket of the shared custody can exit, refund path). The
second release's height is the
SECOND_RELEASESentry incrates/types/src/solana_exit.rs; the live build04600868is cut from the release branchrelease/sol-exit-r2, which sets it. - Limits on 24 November (handoff of 25 November): one withdrawal burns from one bucket and its series; withdrawals below 0.30 USDC are refused; the vault accepted 25 USDC more; a withdrawal takes about four minutes; cancel is refused while the route is paused.
Source anchors¶
crates/types/src/transactions_mempool_receipts.rscrates/types/src/fastswap_types.rscrates/execution/src/entrypoints.rscrates/execution/src/owned_transfer.rscrates/execution/src/owned_transfer_recovery.rscrates/execution/src/fastswap.rscrates/node/src/atomic_swap_rpc_server.rscrates/node/src/fastswap_service.rscrates/storage/src/fastswap_store.rscrates/privacy_orchard/src/lib.rsdocs/specs/fastpay-payment-recovery-v1.md