Skip to content

YOLO target receipts deploy decision

Authority boundary: Decision support only. This sheet deploys nothing, schedules nothing, registers nothing, submits nothing on-chain, and contacts no validator or fleet.

Question: Does the next validator release carry the merged, default-disabled PR #38 code?

Recorded local decision (2026-09-07): A — carry PR #38 in the next qualified routine validator release; leave YOLO target activation unscheduled.

This follows the operator's instruction to proceed with the recommended next steps. It chooses release composition only; it does not authorize deployment or assert a green release candidate.

Later state (checked on 25 November 2026)

"Today" below means 7 September 2026. The merged code (1412b4dc) is an ancestor of the build 04600868 that the six validators run on 25 November 2026 (git merge-base --is-ancestor). Whether a yolo_target_activation_height is scheduled on the chain was not read; the status reply carries no such field.

What is true today

  • PR #38 is merged into main at 1412b4dc. The last deployment handoff reports its YOLO target-receipt code was not deployed or activated. This closeout performed no fresh fleet probe and no deployment.
  • The feature defaults to disabled. It can activate only after a future governance amendment schedules yolo_target_activation_height strictly after the amendment block.
  • A later registration must separately pin reviewed program and run identities, the permitted submitter, expected prior state, replay identity, and its own future activation height.
  • A target receipt records a proved portfolio calculation. It cannot trade, move capital, establish reserves, authorize minting or issuance, or approve a provider or portfolio.
  • Two remediation commits, 4a961eeb and 343a2fe9, targeted the six jobs that had been failing on both PR #38 and pre-merge main. The verification run on 343a2fe9 was still executing when this sheet was requested. CI green is therefore a precondition to check, not a fact established here.

Options

A — Carry it in the next routine release; do not schedule activation

  • Validators receive the compatible code at the earliest routine release, but the feature remains dormant because no activation height is scheduled.
  • This decouples binary rollout and rollback readiness from the later, separately reviewed activation and registration decisions.
  • Release surface grows by default-disabled code; the CI, rollback, and canary preconditions below still apply in full.

B — Hold it out until the first activation decision

  • The next release has a smaller feature surface, even though main already contains PR #38 and release composition must deliberately exclude it.
  • The first activation decision must later be coupled to a compatible validator release, its rollout, and the activation amendment.
  • This delays dormant-code readiness and concentrates more coordination and rollback judgment into the activation window.

C — Carry it and schedule a far-future activation height immediately

  • Validators receive the code as in A, while governance also commits now to a future activation height.
  • This provides no material readiness benefit over A: the feature is already dormant until scheduled, and program/run registration remains a separate gate.
  • It adds an on-chain scheduling decision before one is needed. This option is listed for completeness and is not the recommendation; this sheet schedules nothing.

Lean

Lean A. PR #38 is dormant by design, its release and rollback guidance is already written, and carrying it without scheduling activation separates a routine software-compatibility decision from the higher-risk governance, program-identity, and on-chain activation decisions. A does not authorize a release; it is the recommended answer if every precondition below is met.

Preconditions before any release

These conditions apply whichever option the operator selects:

  1. Current CI is green on main. Check the latest completed run at the release candidate commit. Require all required jobs, including the six formerly failing jobs—check, test, python-sdk, wallet-and-proxy, open-reserve-proof-kit, and public-tree-hygiene—to pass. Do not treat 4a961eeb or 343a2fe9 alone as green-run evidence.
  2. Release precedes activation. A compatible validator release must be deployed before any governance scheduling of yolo_target_activation_height. Selecting A, B, or C in this sheet does not perform either action.
  3. Rollback boundary is explicit. Retain the previous release as the rollback candidate until YOLO target-receipt state exists. After receipt state exists, a pre-feature binary must not be assumed replay-compatible with the populated state.
  4. The canary passes the PR checklist. Verify “matching state roots, receipt finality/replay, and rejection of early, malformed, substituted and duplicate submissions.” Record those results against the exact release candidate before broader rollout.

A CI pass or canary pass is evidence for its stated boundary only. Neither schedules activation, approves a program identity, or grants economic authority to a receipt.

What this sheet does not decide

This sheet does not decide or authorize:

  • an activation height or any activation scheduling;
  • any program, verification-key, registrant, submitter, methodology, parameter, collection-manifest, or replay identity;
  • any registration or submission transaction;
  • any asset registration, issuance, reserve treatment, mint, redemption, capital allocation, or trade;
  • a release date, rollout owner, deployment command, canary execution, rollback execution, or other fleet action; or
  • any other on-chain action.

Recorded answer

A — carry it in the next qualified routine validator release; leave activation unscheduled.

No release date or activation height is selected. Local proof-inventory and public-tree repairs pass; they remain uncommitted and cannot establish remote CI success. At the 2026-09-07 check, main Rust run 34129297733 still had test running. Recheck every required job at the exact future release candidate. All release preconditions above remain open until evidenced.

Sources

  • PR #38 merge: 1412b4dc.
  • PR #38 release, rollback, and canary guidance: docs/handoffs/2026-09-07___dravlic__pr38_merged_arc_deck_unl_proposal.md as recorded in historical commit 817d93f7.
  • Feature and authority boundary: docs/yolo/target-receipt-v1.md.
  • Reserve-profile activation limits: docs/navcoins/yolo-options-reserve-profile.md.
  • CI-remediation commits: 4a961eeb and 343a2fe9; live CI status must be checked at decision time.