Skip to content

Release Process

PostFiat L1 is currently controlled pre-testnet software. A tagged release is an immutable engineering artifact, not a mainnet-readiness claim.

Since 21 November 2026 a release is built from a commit on main only (Master State). A short-lived release branch cut from main may set an activation height (for example release/sol-exit-r2); until it is merged back, the running build is not on main. Validators are rolled one at a time with the release kit, and after each host an accepted transfer and six-way agreement on height, tip and state root are checked (working rules of the 23 November handoff).

  1. Start from a clean, reviewed commit with no open P0/P1 publication blocker.
  2. Run formatting, locked workspace check/test/Clippy, wallet/proxy tests, offline and explicitly configured fork contract suites, strict docs build, dependency/license policy, vendored-source verification, and tracked-tree plus full-public-history secret scans.
  3. Generate the CycloneDX SBOM, signed deployment manifest, checksums, and reproducible-build records. A second clean builder must reproduce the node hash before promotion.
  4. Exercise snapshot migration, rollback compatibility, and a rolling canary. Stop on state-root divergence, rejected expected receipts, committee-roster mismatch, or any failed conservation/security invariant.
  5. Sign the annotated tag and release checksums. Publish only redacted evidence; never upload node data, keys, wallet backups, private notes, or raw provider captures.
  6. Retain the staged prior binary and schema-compatible snapshot until the post-release observation window closes.

Production/mainnet promotion additionally requires external cryptography, circuits, contracts, and protocol review plus HSM/remote-signer custody and a production storage engine. Those are not implied by this process.

Protected-branch requirements

The public main branch must reject force-pushes and deletion, require review of CODEOWNERS paths, require all review conversations to be resolved, and apply the same rules to administrators. At least one approving review is required; changes to consensus, state transitions, cryptography/proofs, custody, bridge, release or workflow code require two approvals including the owning security or protocol reviewer.

The following pull-request jobs are required and may not be bypassed by a label or a maintainer-authored merge:

  • rust-ci / check
  • rust-ci / test
  • docs-build / build
  • product-security-ci / public-tree-hygiene
  • product-security-ci / rust-supply-chain
  • product-security-ci / python-sdk
  • product-security-ci / wallet-and-proxy
  • product-security-ci / evm-contracts

The secret-backed product-security-ci / official-mainnet-fork job is required on the exact post-merge release revision before tagging; it is deliberately not treated as an offline PR success. Publication also requires the exact clean candidate to pass scripts/verify-publication-candidate and scripts/test-productionization-closure-table --require-closed. A skipped, neutral, cancelled or stale check is not release evidence.