Cobalt Independent-Operator Proposal Path Research Specification¶
Status: Text Improvement Harness full gate passed on 2026-08-26 — average 88.73/100 (GPT 91.80, Fable 86.40, GLM 88.00; five runs per lane; run group cobalt-independent-operator-proposal-path-research-spec); scored content SHA-256 91ad402672653f3e76489f7e7de719d5597553111985d939a9e90b52a1edec89; Task Node lock pending the operator's decision
Date: 2026-08-25
Decision owner: Post Fiat
Prior work: Cobalt Activation Research Specification, Cobalt Adversarial Verification Research Specification, independent-operator onboarding contract
Decision scope: proposal origination, operator/key custody, trust topology, and the evidence required before Post Fiat may claim operator decentralization
Locked decision¶
The independent-operator gate from the Cobalt activation specification is reinstated as a separate mandatory milestone. It is not cancelled, treated as simulation, or silently folded into adversarial protocol testing.
The milestone begins after the adversarial-verification milestone. It must move the six controlled-testnet validator slots to six genuinely independent operators and prove that an independent operator can originate a registry proposal without a Foundation process constructing or rewriting it.
This decision does not claim that those operators exist today, does not recruit them inside the adversarial campaign, and does not authorize a live migration. It locks the design and the next acceptance boundary. Until the later milestone passes, every public surface must say that Cobalt proves protocol capability on a Foundation-administered controlled testnet, not operator decentralization.
Cobalt may remain the controlled-testnet validator-trust ratification authority while this gate is completed. A missing independence gate is a process and decentralization gap; it is not by itself one of the live safety stop conditions that authorizes rollback to Foundation validator-trust authority. The gate is mandatory before any mainnet recommendation, any claim of independent operation, or any declaration that the original activation program is fully compliant.
Current path and custody boundary¶
Today the Foundation operator performs every proposal-origin action:
- A Foundation-run process reads the current registry, trust root, authority lineage, and intended registry delta.
- Production helpers construct the proposal and deterministically assign the first validator as proposer. In the current code, 'propose_nonuniform_governance_amendment' selects the first trust view and 'certify_validator_registry_update' selects 'validators[0]'; 'verify_validator_registry_update' requires that same identity.
- Foundation-administered Cobalt sidecars sign the RBC, ABBA, MVBA, and DABC transcript with their validator-domain ML-DSA keys.
- The same Foundation-administered validator fleet provides the scoped validator-update authorizations. A Cobalt-authorized update requires the decision certificate and at least the active quorum of authorizations.
- Consensus v2 orders the resulting governance batch. Consensus v2 remains block finality; Cobalt remains limited to validator-registry and trust-graph ratification.
The proposal builder does not itself possess quorum, but the same administrative boundary presently controls every proposer, protocol signer, and authorization signer. The live chain therefore demonstrates a protocol boundary, not an independent operator boundary.
The current key classes are kept distinct:
| Key or identity | Current custodian | Authority |
|---|---|---|
| Operator/onboarding master key | Foundation for current validators; future operator for its own slot | Signs operator manifest and control attestations; never signs blocks or directly mutates registry state |
| Validator hot ML-DSA key | Foundation-managed validator host today | Signs Consensus v2 votes, Cobalt protocol messages, and scoped validator-update authorizations for one validator |
| Proposal process identity | Foundation process today | Constructs proposal bytes but has no independent ratification power |
| Snapshot publisher | Separate deployment role | Signs snapshots only; has no Cobalt or Consensus v2 vote |
| Repository/release signer | Release process | Identifies software lineage only; has no chain authority |
Private keys must remain on the operator-controlled host or its declared offline custody boundary. A coordinator, relay, browser, model, or Foundation service may carry public proposal bytes but may not sign for another operator.
Required non-Foundation proposal path¶
Proposal envelope¶
Add one canonical, versioned proposal envelope signed by an admitted operator's onboarding master key and its active validator hot key. It binds at least:
- chain ID, genesis hash, and protocol version;
- current authority-transition ID, registry root, trust-graph root, and accepted Cobalt history sequence;
- proposal slot, activation height, and expiry height;
- operation, subject validator, old and new registry records, and old and new trust roots;
- canonical registry-update payload hash and evidence-packet root;
- proposer validator ID, operator-manifest hash, onboarding challenge ID, and both signature algorithms;
- a unique nonce derived from the previous accepted history ID and proposal slot.
Both signatures are admission checks, not ratification. A valid proposer cannot commit its own proposal.
The envelope fails closed on an unregistered proposer, stale registry or authority lineage, wrong chain, wrong root, reused nonce, expired slot, payload mismatch, operator-manifest mismatch, missing signature, or non-canonical encoding. Rejection must leave Cobalt and chain state unchanged and must produce a named receipt.
Transport and deterministic selection¶
Any currently admitted validator operator may submit an envelope to any Cobalt sidecar over the bounded authenticated RPC. Relays are untrusted and may only forward exact bytes.
The current implicit 'validators[0]' proposer rule must be replaced. For one proposal slot, every correct sidecar:
- verifies each envelope against the same registry and operator-manifest set;
- deduplicates by envelope ID and payload hash;
- orders valid candidates by the canonical envelope ID;
- admits the candidate whose proposer is selected by a domain-separated hash of the previous accepted Cobalt history ID, slot, and active validator set;
- records every valid but unselected proposal as deferred, not rejected.
If the scheduled proposer submits nothing before the bounded view timeout, the same hash selects the next validator for the next view. No coordinator chooses the winner, and a Foundation relay cannot alter candidate bytes or selection.
Ratification and ordering¶
The selected payload enters the existing signed RBC -> ABBA -> MVBA -> DABC path. Acceptance still requires strong support under every correct validator's local trust view and the active Cobalt certificate rules. The resulting validator update then requires the existing scoped current-registry authorizations at quorum. Proposal signatures cannot be counted as protocol contributions or authorizations.
The ordered governance record must retain the envelope ID, proposer validator, operator-manifest hash, selected view, decision-certificate ID, and exact authorization identities. Consensus v2 orders and finalizes that governance batch. Neither the proposal service nor Cobalt gains block-finality authority.
Independent trust topology¶
The controlled-testnet migration target is six validators, quorum five, with exactly six independent operator groups:
- one validator maximum per operator, provider-account boundary, host administration boundary, and validator-key custody boundary;
- at least three infrastructure domains;
- each local trust view starts with all six admitted validators, threshold q = 5, and tolerated Byzantine count t = 1;
- the Cobalt inequalities hold for each row: 1 < 2(5)-6 and 2 < 5;
- one operator controls one vote, so one operator cannot reach quorum;
- removal or outage of any one operator leaves five validators, so one operator cannot block quorum alone;
- no Foundation account, funding boundary, administrator key, custody system, or legal-control domain may appear in more than one operator group.
Non-identical trust views may be introduced only after the all-six baseline passes the same compatibility, one-outage, catch-up, and authority-transition tests. A label or self-attestation is not independence. The retained 'postfiat-cobalt-independent-operator-onboarding-v2' contract remains the admission boundary, refreshed to the then-current chain, release, registry, and trust roots.
Mandatory follow-on milestone¶
The reinstated milestone must not be marked complete until all of these gates pass:
- Six operator receipt sets verify under six distinct onboarding master keys, provider accounts, host administrators, custody boundaries, funding boundaries, and legal-control domains.
- The live registry contains the six independently held hot keys and exactly matches the refreshed onboarding contract.
- The proposal-envelope implementation has canonical hashing, dual-signature verification, replay/expiry checks, bounded transport, deterministic proposer/view selection, persistence, replay, and named fail-closed tests.
- A disposable-clone migration and forward rollback pass before live changes.
- One non-Foundation operator originates a live proposal while the Foundation proposal builder is offline; the exact envelope, selected proposer, Cobalt signers, scoped authorizers, and Consensus v2 receipt are recorded.
- Every single-operator outage still permits five-of-six ratification and Consensus v2 finality; two-operator loss safely halts validator-trust changes.
- Wrong-chain, stale-root, replayed, expired, payload-swapped, manifest-substituted, coordinator-rewritten, and self-authorized envelopes all reject without durable mutation.
- Catch-up, one key rotation, one trust-view change, Foundation-to-independent custody transition, and the separately authorized forward rollback all preserve one accepted history.
- A checksum-bound public packet, CLI, read-only browser view, redaction scan, and independent control review pass.
Recruitment and live migration require separate operational authorization. This specification supplies neither.
Failure and publication rules¶
If the later milestone fails, keep the public state explicit: 'FOUNDATION_ADMINISTERED'; do not claim operator decentralization. Repair the owning boundary and rerun the unchanged admission and proposal corpus.
Rollback of live Cobalt authority remains governed by the adversarial specification's observed safety/finality stop conditions, not by a missing operator receipt or a failed design test alone.
Every public summary must keep these three statements together:
- Cobalt ratifies validator-registry and trust-graph changes.
- A separate policy and operator-admission layer decides which validators deserve trust.
- Until the reinstated milestone passes, proposal origination and all live validator authorizations remain Foundation-administered.
Locked acceptance statement¶
The independent-operator requirement is reinstated, not deferred. Its own milestone must implement the proposal envelope and complete the six-operator live migration. The current adversarial milestone may close E6 when this specification and its checksum-bound decision packet verify, but that closure does not satisfy the reinstated operator milestone itself.