Cobalt post-activation review¶
- Operator: Domagoj Ravlić (
dravlic) - Date: 2026-08-25 UTC
Historical post-activation snapshot
This handoff preserves a dated operational snapshot and is superseded by
Current State. A later authenticated
all-six validator/RPC probe on 2026-08-26 identified the active runtime as
cobalt-verifier-92b63f5a, not cobalt-activation-8694b99d or current Git
HEAD. Its body is intentionally retained as history; do not use the mutable
runtime or campaign statements below as current state.
BLUF¶
Took over after the 2026-08-25 Cobalt activation run. Confirmed from the repository and the packet verifier that Cobalt has been the live validator-trust authority on the controlled testnet since height 916, that the first Cobalt-authorized key rotation committed at height 917, and that no active plan remains. Two published documents now lag the live state: the earlier handoff still says deployment stopped before live mutation, and the blog still says Cobalt authority is off. Drafted the proposed next research specification, Cobalt Adversarial Verification, which turns the open critique of the activation evidence into experiments. Nothing is committed, scored, or requested from Task Node yet.
Current state¶
- Live boundary, as recorded in
activation-status.json: statusACTIVATED, authority modecobalt-validator-trust,writes_validator_registry: true,controls_block_consensus: false, chainpostfiat-wan-devnet-2, height 919, registry root945768d5…c37e. - Verified locally:
python3 benchmarks/cobalt-activation-live/packet/verify_packet.pyreturnspacket-okwith rootb603b59d0245a7c73e766d0ba7fb19975f11e1e39bdd7263bf87e65250438bfb;docs/plans/active/is empty; worktree clean atfe046536onmain. - Task Node: 22 rewarded, 21 refused, 0 outstanding on the shared
0xPostFiatChadlink. Live cutover tasktask_40f389235be48756a9933f42d0d4dc6cis rewarded. - Stale documents:
2026-08-25___postfiatchad__cobalt_governance_activation.mdbody still reads "Deployment was deliberately stopped before live mutation" and lists the cutover as the next action; only its links were updated after the cutover.postfiatorg.github.io/content/blog/cobalt-further-evaluation.mdline 154: "Cobalt authority remains off today".- Not re-probed on the live fleet from this session: node processes, heights, and roots come from the committed packet, not from a fresh
live-statusrun.
Review of the activation evidence¶
Grounded in the locked specification, the completed milestone, and the article. Detail and the experiment mapping are in the draft specification's "Claims, evidence, and gaps" table.
- Scope wording. The code boundary is correct: Cobalt ratifies registry and trust-graph changes and never touches block finality. The public phrase "validator governance" reads as the whole governance. Cobalt does not decide who deserves trust; that is a separate layer.
- Proposal source is still central. Every live change so far was proposed by the Foundation operator and authorized by six Foundation-administered validators. Cobalt gates changes; it does not yet decentralize who asks for them.
- A locked gate was redefined. The activation specification's Experiment 4 and ACTIVATE gate required at least three independently controlled operator groups, and stated that no milestone may redefine the gates without a newly locked specification. The milestone cancelled the operator task and re-scoped independence to simulation. The activation went ahead on that basis. This needs a recorded decision, not silence.
- Cooperative evidence only. Faults were scheduled, not adversarial; one Byzantine strategy; oracle and corpus by the implementing team; 18 cases; 50 finality rounds. The blog acknowledges the limits. The next specification is where they get closed.
- Reversibility is Foundation-controlled. Rollback was rehearsed on a clone and is authorized by the same six validators. Fine for a testnet, should be stated as such and executed live once.
Next decision or action¶
Decisions taken by the second operator; object in the next handoff if any is wrong:
- Next specification: adversarial verification. The activation handoff itself names thorough adversarial testing as the open work, and no active plan exists.
- Independent-operator gate: decided inside the specification. Experiment 6 records whether the gate from the locked activation specification is reinstated as its own milestone or formally deferred, and that outcome is locked with the rest of the specification. It is not silently dropped.
- Article correction now. "Cobalt authority remains off today" is a factual error about the live state and is corrected ahead of the adversarial results.
- Task Node identity: the shared
0xPostFiatChadlink on this machine. The machine and the link were provided for this purpose; the operator name in handoffs and commit messages identifies the human.
Next bounded actions, in order: score the draft with the Text Improvement Harness, lock it through Task Node, build the milestone document through Task Node, then run the experiments as Task Node tasks.
References¶
- Draft specification:
cobalt-adversarial-verification-research-spec.md - Locked activation specification:
cobalt-activate-or-retire-research-spec.md - Completed milestone:
cobalt-activate-or-retire-milestone.md - Activation packet:
benchmarks/cobalt-activation-live/packet - Article: Cobalt: Further Evaluation
- Prior handoff:
2026-08-25___postfiatchad__cobalt_governance_activation.md
End of session 2026-08-25¶
- Commits:
3d1c2ab4added this handoff and the draft adversarial-verification specification;e7d1fe4corrected the Cobalt authority state inpostfiatorg.github.io;a6aaa4bblocked the specification;683eb3beadded the milestone document. - Text Improvement Harness: 89.27 average (GPT 89.20, Fable 88.40, GLM 90.20).
- Rewarded Task Node tasks: specification lock
task_158622307482e23fb4519889b53b475f; milestone documenttask_d28eb3465dcac9a32524c25bba996e1e. - Current state: E1 is being started as a
/goalrun in tmux sessiondravlicon this machine and will update the milestone document as it progresses. E2 will not start automatically.
Repository-state reconciliation 2026-08-25¶
This section supersedes the end-of-session state above for current readers.
- E1 completed across the frozen 10,240-graph corpus. Repository HEAD advanced
to
c2de415d, which records the E2 kickoff but contains no E2 implementation or result packet. - An authenticated read-only probe completed at
2026-08-25T15:37:40Z. All six validator, RPC, and shadow services were active; every validator remained equal at height 919 with the recorded tip/state roots and an empty mempool. - The active consensus runtime is
cobalt-activation-8694b99d, binary SHA-256431f194b…783f4. The governance auditor is the separatecobalt-live-governance-audit-05507758binary, and the advisory shadow iscobalt-shadow-registry-reset-43ac8a7d. - The activation packet's
cobalt-verifier-92b63f5aconsensus label does not match the active validator services. The packet remains unchanged as checksum-bound historical evidence. - Current State now owns the live runtime, auditor, shadow, source HEAD, adversarial campaign, and freshness boundary.
- The probe changed no fleet files or services and invoked no write RPC method.