Evidence review and next specifications¶
- Operator: Domagoj Ravlić (
dravlic) - Date: 2026-08-26 UTC
BLUF¶
Completed a read-only review of the overnight Cobalt adversarial campaign, pushed four documentation and process corrections, and proposed two harness-scored research specifications as the next milestone candidates: storage scaling and Dynamic UNL proposal sourcing. No experiment was started, no Task Node action was taken, and the controlled devnet was not probed or touched.
Current state¶
Evidence review¶
The consolidated campaign packet passed at the campaign-completion revision with
adversarial-packet-ok and checksum-manifest root
a789372819c173d3c290f84b7ad10bea3ddef01ffc5a012e837ba3dc32d36368.
The packet's own SHA256SUMS.txt still verifies. A semantic verifier run
against current main now stops at its publication-document binding because
the corrections below changed packet-bound documentation and mkdocs.yml;
the experiment packets and consolidated packet were not modified. See the
completion handoff
for the original passing run and the
packet
for the immutable campaign evidence.
The review found:
- E1 fixture defect, not an oracle or production defect. The 8,534 initial
disagreements came from the harness adapter supplying 64-character genesis
and registry-root fixtures where production requires 96 lowercase hex
characters. Commit
43606cd9corrected the fixtures; the unchanged 10,240-case corpus then passed. The mismatch review retains the initial disagreement evidence. - E4 measured chain-height growth, not a different setup. E4's first 50
baseline rounds reproduce the activation result, about 1,664 ms versus 1,660
ms p95. Latency then grows nearly linearly to about 14.9 seconds by round 500
(correlation approximately 0.9998). The cause is the JSON/JSONL path
rescanning the authenticated chain on every append in
read_jsonl_tailand proposal/state construction rebuilding full ordered history. The 5% gate remains valid as a paired, same-length A/B comparison; the absolute latency is not a finality SLA and storage scaling blocks any public testnet. - The independent-operator specification lacked its stated lock evidence.
It had been marked
Lockedwithout a Text Improvement Harness score or Task Node lock record. It now records a passing 88.73 score and says the Task Node lock is pending the operator's decision. - The first E5 return was not fully rehearsed. The height-921 return bound a stale trust root because the rollback-then-return sequence and its protocol-native post-return trust-root binding had not been clone-rehearsed. The signed corrective rollback and return committed at heights 922 and 923. The E5 packet preserves both the first attempt and the correction.
Corrections pushed on main¶
Four corrections landed in three commits:
31092413names the 50-roundconsensus_round_msand 500-roundwallet_to_finality_msmetrics separately and marks them non-comparable in both completed milestones. It also adds the standing clone-first rehearsal rule for every live authority transition, including return-to-Cobalt trust binding, to Cobalt governance.5448da87records the independent-operator specification's 88.73 harness score and leaves its Task Node lock pending.3d1080b4records the E4 chain-height finding in the adversarial results and Current State, and defers storage scaling in the deferred-plan index. The E4 packet was untouched and its checksums pass.
Proposed next specifications¶
Neither specification is Task Node-locked:
- Storage Scaling and Bounded Finality
passed the harness at 88.67 in
2613ca5f. It requires bounded per-height storage and proposal cost, clone-rehearsed migration, p95 finality at height 5,000 within 10% of height 50, and byte-identical archive replay. - Dynamic UNL Proposal Source
passed at 89.13 in
e1567605. It evaluates the PFT Ledger Dynamic UNL pipeline's sealed, converged result as deterministic proposal content for Cobalt-ratified registry changes. It complements the independent-operator specification, which governs who may submit, and positions Dynamic UNL as the concrete validator evaluator needed by the DGA constitutional policy layer.
Task Node, references, and operational boundary¶
- Per the operator's instruction, Task Node was not used for E2-E6 or today's
review and specification work. The repository still records
task_91aebe5c632d90e03e7e151a6ffeb736as accepted before E2 and unused for execution or completion. The local Task Node session has expired, so no server-side status was checked and no Task Node action was taken today. - Read-only reference clones were added at
~/repos/dynamic-unl-scoring(f18e6b4c) and~/repos/validator-scoring-sidecar(e6907faa); both remain clean. - The pre-handoff repository state was
mainate1567605, matchingorigin/main. The commit containing this handoff is its documentation-only descendant. - No live fleet probe, deployment, service restart, validator write, or experiment occurred in this session. The last observed fleet state and deployed binary/source lineage remain the dated evidence in Current State; merged documentation and research specifications are not deployment evidence.
Next decision or action¶
The decision owner should:
- Choose the next milestone: storage scaling, which blocks a public testnet; Dynamic UNL proposal sourcing, which addresses the proposal-source half of E6's “who proposes” gap; or both in a stated sequence.
- Confirm whether the AGENTS.md Task Node rule still applies. If it does, lock the chosen specification through Task Node and then request its concise milestone document through Task Node before implementation.
- Confirm which chain receives the second operator's hours. On the PFT Ledger Dynamic UNL roadmap, G.6 sidecar governance verification and E.1 signed-vote publication remain open.
References¶
- Storage Scaling and Bounded Finality Research Specification
- Dynamic UNL Proposal Source Research Specification
- Independent-Operator Proposal Path Research Specification
- Correction commits:
31092413,5448da87, and3d1080b4 - Current State
- Consolidated adversarial packet
- Cobalt adversarial-verification completion handoff
- Dynamic UNL roadmap