Storage G4 timeout and persistent remediation¶
Historical snapshot: this handoff predates the v3 release run. V3 later reached height 5,000 but failed its first high-height resource-sampling gate. Resume from the active storage-scaling milestone, not from the commands below.
- Operator: Post Fiat Chad (
postfiatchad) - Date: 2026-08-28 UTC
BLUF¶
The active storage-scaling milestone
still blocks public testnet. The selected transactional redb candidate did not
show the original full-history rescan in the four-hour G4 attempt, but that run
failed its time budget because the evidence harness launched and restarted node
processes once per setup block. Commit 438fb29c replaces only that setup path
with one persistent six-validator batch loop; focused tests, a real 12-round
smoke, stop/resume, and helper-tamper rejection pass. G4 itself has not
passed: the next bounded action is one new, clean, checksum-bound v3
qualification run from height 1.
Current state¶
- Repository branch is
main. The implementation boundary is438fb29c(test(storage): make setup advances persistent). This handoff and the adjacent milestone correction are the documentation checkpoint; the exact clean revision used for the new run must be captured by its checkpoint rather than guessed from the implementation commit. - The candidate remains source
ae65844190f153cbdd49d1e5ac28ab96a19f7af4and release node-binary SHA-256891bfb42ea16af844fd72351ee38a90eaeb8f4302492a8fd64ce0f3db5dcbbf4. The node binary did not change during the harness remediation. - The exhausted v2 output is
/home/postfiatchad/repos/postfiat-storage-g4-8768866a-ae658441-v1. Its checkpoint SHA-256 is5c48b9b8ad7d97ac9797a5b7c2f9388328cc82beebe2f7e1f31b334caa36ef85. It ran from2026-08-27T23:54:36Zthrough2026-08-28T04:10:24Z, consumed 14,398.975 of 14,400 seconds, isINTERRUPTED, and has no final campaign report. - The v2 run durably reached height 3,050 with prepared-fleet SHA-256
68d9e538d2f3727ab6a60db00238c9abaebfaad024c5eaf0f6aecde4a81dd8df. Completed 1,500-round chunks reported p95 consensus times of 1,877.727 and 1,928.697 ms, six-validator convergence, literal accepted receipts, and zero full-history reads. The partial next unit reached height 4,542 with diagnostic p95 1,928.775 ms and zero full-history reads. That partial unit is not release evidence. - The timeout was a harness problem: setup launched one foreground node and restarted resident validator services for each block. It was not evidence that the transactional append path resumed full-chain rescans.
- The remediation adds the release helper
postfiat-storage-corpus-batchesand keeps validator processes resident for setup-only advances. Canonical batches, certificates, every processed round, helper/build identity, runner identity, resources, receipts, and before/after fleet digests are bound in v3 checkpoints and packets. The three measured G4 rows still use the previous measurement path. - Two Rust helper tests and 60 focused Python tests passed, along with warnings-denied release clippy and formatting checks.
- A real six-validator persistent smoke advanced height 1 to 13 in one
foreground process in 5,655.333 ms. It recorded 72 committed writes, 4,896
page reads, 576 page writes, zero full-history records or bytes, and
six-validator convergence. Raw report SHA-256 is
4a976603449edc16b1d48418d09f56865eedaefb08c1d0530eb9f1732a3535a4. - The v3 development campaign report SHA-256 is
e1e87b854dc4fbae88f00e3ebfe9c4c848706090cd52d6c394c5cd2b8ea8518f. The controlled stop/resume report SHA-256 isf8501bf2fa15d1fc5a5714f3f5a476b28c6419f250fed9176ebb3f4e0f1abc87. Resume also refused an intentionally changed batch-builder binary before executing another unit. These are development proofs, not G4 evidence. - The helper currently in the primary
target/releasedirectory embeds the pre-commit development revision and must not be used for the release run. Rebuild it from the clean documentation checkpoint. - The old v2 run cannot be resumed under v3 and must not receive another budget. Start one unique v3 output from height 1.
- No campaign or validator process was alive at handoff inspection. No Task Node, subagent, controlled-devnet query, data copy, service action, deployment, or mutation was used.
- The last authenticated controlled-devnet observation remains the point-in-time
height-924 capture from
2026-08-26T06:34:55Z–06:35:50Z; see Current State. This session performed no live probe, and the storage candidate is not deployed.
Next decision or action¶
Commit and push this documentation checkpoint. From that clean revision, rebuild the setup helper, verify both binary identities, and pin a detached runner worktree:
cd /home/postfiatchad/repos/postfiatl1v2
export CARGO_FEATURE_PURE=1
export CARGO_TARGET_X86_64_UNKNOWN_LINUX_GNU_LINKER=/home/postfiatchad/.local/bin/zig-cc
cargo build --release --locked -p postfiat-bench \
--bin postfiat-storage-corpus-batches
sha256sum target/release/postfiat-node \
target/release/postfiat-storage-corpus-batches
git status --porcelain
STORAGE_RUNNER_REV="$(git rev-parse HEAD)"
git worktree add --detach \
"/home/postfiatchad/repos/postfiat-storage-runner-${STORAGE_RUNNER_REV:0:8}" \
"$STORAGE_RUNNER_REV"
The candidate node hash must remain 891b…bf4, the helper must report the
same embedded revision as the clean runner, the worktree must be clean, and the
new output path must not exist. Then start exactly one v3 output, with the first
unattended segment capped at two hours:
cd "/home/postfiatchad/repos/postfiat-storage-runner-${STORAGE_RUNNER_REV:0:8}"
timeout --signal=INT --kill-after=120s 7200s \
python3 -u benchmarks/storage-scaling/run_paired_campaign.py \
--node-bin /home/postfiatchad/repos/postfiatl1v2/target/release/postfiat-node \
--batch-builder-bin \
/home/postfiatchad/repos/postfiatl1v2/target/release/postfiat-storage-corpus-batches \
--expected-source-revision \
ae65844190f153cbdd49d1e5ac28ab96a19f7af4 \
--output-dir \
"/home/postfiatchad/repos/postfiat-storage-g4-${STORAGE_RUNNER_REV:0:8}-ae658441-v3"
If that segment stops cleanly, independently verify the checkpoint, confirm no child process survived, and resume the same output for at most the remaining two-hour segment. Do not create a second output. If the campaign passes, verify the final report requirement by requirement before closing G4 and packaging the locally available G2/G4 material. Exact height-924 replay still requires a separately authorized read-only validator-directory copy; G6 still requires separate authorization for six distinct stopped copies.