Skip to content

Safety landed and UNL V2 milestone complete

  • Operator: Domagoj Ravlić (dravlic)
  • Date: 2026-09-08 UTC

BLUF

This session landed the previously reviewed safety closeout, restored a fully green CI baseline on main, and implemented all five sections of the UNL Amendment V2 milestone in one day. The evidence contract, admission policy, paired adversarial and liveness gate, explicit human CLI, and user report are complete. V2 remains SHADOW_ONLY: this is implementation and offline evidence, not promotion or live authority.

Current state

  • Safety and CI: 80f2232b landed the 15 files mapped by the safety-closeout threads without additional content edits. The linked proof-input review records the reproduced public-tree hygiene sequence, 125 reserve tests with three existing ignored SP1 cases, 20 A666 tests, all ten fuzz targets, and strict documentation build. Its product-security-ci run was the first full pass for that workflow. Rust CI then passed on 519b1bad (run), establishing the fully green three-workflow baseline. That commit changes only the genesis-registry golden-vector test: the failure introduced at fa7e67ff required a source archive already documented as fetched out-of-tree at a1161ff9. It does not change the vectors or serialization; the Rust and Python implementations retain byte-for-byte agreement.

  • UNL Amendment V2: The locked amendment still hashes to a74bdf603c70ebc3432499b555b470d87da93e13c54424b3687f834bf02f892f.

Section Commit and implemented surface
A — evidence contract a710f96c: closed versioned schemas and evidence verification, including control epochs, the 180-day fresh window, separated consent classes, no sale-detection field, the explicit unchanged-key limit, and malformed-record isolation.
B — graph and admission 1306ac26: frozen-window policy, exact max(2,N/10) caps, CLEAR / SATURATED / EXISTING_BREACH, preserved incumbent breaches, and no funding-derived positive mass.
C — paired gate 41f6ae1a: preregistered offline gate, outputs, and committed trial history.
D/E — CLI and report 74c9e732: explicit python -m postfiat_rpc.tasknode_unl_v2 derive/render interface and human report documentation; milestone retired to completed plans.
  • Paired gate: The core and extension preregistrations were locked before their trials at 94bc0979… and 180698bd…. The frozen V1 baseline was byte-verified and not rewritten. The verdict is PASS_SHADOW_ONLY, with 14/14 consent-complete honest controls admissible; disconnected vouch rings and parallel identities gained zero seats, while unsolicited dust and larger inflows were audit-only and did not change target mass, cluster, group, or result. Hidden unchanged-key control changes and undeclared common funding remain unresolved public-input limits, and accepted seed-connected relations can admit attacker-controlled accounts within the tested budget. These are design facts exposed by the gate results, not live-validator evidence.

  • Verification and protected boundaries: The combined V1/V2 selection passed 167 tests and 43 subtests; the actual CLI separately passed 10 tests. The V1 modules, frozen V1 simulation artifacts, amendment and lock records, and whitepapers are byte-unchanged across the four V2 implementation commits.

  • Task Node: Sections A and B used tasks task_aece75f855b2633598b89dffd266a024 and task_91a089bd14dedf6b6fb681fae7e49561; initial evidence was submitted and both await verification. Section C generation requests req_cf56f893… and req_6948d197… failed with taskgen_provider_output_invalid and needsAttention=true. The operator then ended Task Node lifecycle use for sections C–E; the milestone journal is the retained record.

  • Operational boundary: No devnet, validator fleet, deployment, registry, or economic action occurred, and no live probe was performed. The only writes outside Git were the two authorized standard Task Node lifecycles for A/B; other network access was read-only CI inspection. The last documented fleet observation remains height 924 on 2026-08-26 in Current State. Source milestone head 74c9e732 is not a deployed-binary claim.

  • Other lanes: The whitepaper was a read-only reference; its separate whitepaper handoff remains unchanged. StakeHub was untouched; fix/pr8-safety-20260907 and its reviewed working tree remain local and unpushed. PR #8 publication or disposition is still an operator decision.

Next decision or action

  1. Read the gate README and shadow report before considering promotion. The unresolved control/funding limits and accepted seed-bridge admissions are policy facts, not missing code.
  2. Verify the Section A/B Task Node evidence when convenient, then decide whether to backfill lifecycle records for C–E or retain the failure note as the final ledger record.
  3. Decide whether to push fix/pr8-safety-20260907 and update StakeHub PR #8, or dispose of the local patch another way.
  4. The 2026-09-03 direction adoption and Z3 G1 remain open. The PR #38 decision is recorded as option A and awaits the next separately qualified release; activation remains unscheduled.

References