Signing fix qualification hold¶
- Operator: Domagoj Ravlić (
dravlic) - Date: 2026-09-09 UTC
BLUF¶
This session answered the open deployment question for consensus signing fix
bbb291ce
with a fresh read-only fleet observation, a
local release qualification,
and a harness-scored decision sheet.
The result is HOLD — LEAN C: the candidate built from main is not
deployment-qualified, chiefly because main omits validator-runtime behavior
present in the deployed A666 source lineage and consolidated in open PR #39.
No fleet or live-chain mutation occurred.
Current state¶
- Observed fleet: The capture ran from
2026-09-09T09:24:54Zthrough09:27:00Z. Validators 1–5 agreed at height 1020, state root587c6526…d39bead6, with empty mempools, 15 blocks beyond the September 7 observation. Validator-0's RPC reads timed out; its host and services were up, but its ledger values remain unknown. Resolving that RPC state is a deployment precondition. - Deployed identity: All 12 validator/RPC processes ran release
a666-source-route-20260907, binary SHA-25657b0f4d1…634eec83. The signing fix is not deployed, so its cross-phase monotone-round invariant does not govern live signing. The observation used read-only queries and identity checks only. - Repository boundary: Observation source
4153376bproduced candidate binaryaf4ccc3e…947def; pre-handofforigin/mainis qualification commitb6c13c9f. Both commits andbbb291ceare reachable fromorigin/main, but repository ancestry alone is not deployment evidence. - Qualification result: The locked build passed; exact-hash reproduction
failed because the second build differed in six ELF
RUNPATHbytes. The deployed-source manifest reconstructed 26/26 files, but the signing-only lineage gate failed. The signed height-931 archive and six loopback clones passed import, verification, transactional rebuild, both service start orders, finality from 933 to 934, root convergence, and restart. That is archival compatibility evidence, not a current-height rehearsal. The focused delayed-certificate regression, 20 consensus tests, three transport/RPC tests, and Clippy passed. A current-height all-six snapshot and the exact deployed rollback binary were unavailable locally. The qualification receipt recordsHOLD_NOT_DEPLOYMENT_QUALIFIED; no release manifest or rollout authorization exists. - Lineage consequence: A binary built from current
mainwould omit the fleet's live Arc/PFETH source-route behavior. Open draft PR #39 consolidates that behavior and is stacked on the open draft PR #37 integration branch. Merge order or an equivalent lineage decision must precede a fresh qualification; neither PR is live authority. - Threat boundary: The defect requires a delayed valid certificate and specific timing. No live exploit was demonstrated, but the pre-fix fleet remains exposed to the condition described by the signing-round contract.
- Other work: The operator reports the workstation-side send/exec quoting and temporary-file race fixed; server-side code was unaffected. No Task Node action occurred. The separate whitepaper and consensus handoff retains the unfinished abstract-count, consensus-section, and defect-inventory work and was not modified here.
Next decision or action¶
- Decide the release lineage: merge PR #37 then PR #39, or record an equivalent route that preserves the deployed A666 runtime.
- Before reconsidering deployment, resolve validator-0 RPC, obtain an authorized current-height all-six snapshot, produce byte-identical release builds, retain the exact rollback binary, and rerun the decision sheet's deployment-exact gates.
- Complete the whitepaper abstract-count and consensus-section corrections and the source-backed defect inventory.
- Older open work remains: decide whether to push the StakeHub PR #8 fix, adopt the September 3 direction, and begin Z3 G1.