Combined release merged, repaired, and qualified¶
- Operator: Domagoj Ravlić (
dravlic) - Date: 2026-09-18 UTC
Update: The September 21 handoff
records green CI for a5b1e757, deployment preparation awaiting publisher
signatures, burn 6 repairs reserved for the next release, and the cleared
history secret-scan blocker. Nothing has been deployed.
BLUF¶
This lane merged main into the combined release candidate (draft PR #41),
repaired both P1 review findings, and merged PR #42
into release/combined-devnet-20260915. The qualification packet
records passing disposable-copy history, rotation, and pre-activation rollback
checks. The initial Clippy and reproducible-build failures were closed the same
day; both clean builds of a5b1e757 now match. Deployment to the six validators
is next, subject to the remaining gates, its own explicit go, and a written
rollback path. Nothing was deployed today; the live fleet was untouched.
Current state¶
-
Repository and integration: This checkout is
mainat1a7f7bf1before this handoff;git pull --rebase origin mainwas already up to date. Onintegrate/main-into-combined-20260918, merge4d0a0b32contains both main1a7f7bf1and candidate15126ac3: 36 main commits covering burn-four and burn-five repairs, the P3 sweep, transport timing-test fix, RPC probe, and Z3 tooling. The sole conflict was in rpc_cli.rs. Main's rpc_serve_runtime.rs extraction was kept, preserving the candidate's StatusReport cache, initial local-status seed, data-directory and health-cache helper parameters, report-age expiry and refresh, and publish-on-success timing; each is named in the merge body. Recorded merge checks passed: RPC serve/transport 13; vote locks 18 (1 ignored); types 147; execution 202; ordering 35; FastPay 19 + 1 + 4; Python 611 (3 skipped, 103 subtests); proof public-input inventory and three documentation gates. -
P1 repairs: Both are consensus-affecting, source-only changes, recorded by
b8b8145din the updated review.6849d976requires V2 authorization for new Arc activations, binding a canonical digest of bootstrap trust state (initial validator set and checkpoint); activations differing only in trust state are no longer both accepted.397b4f53shares certificate count/shape validation between FastPay acceptance and V2 commitment encoding: accepted certificates fit the commitment bound, and unknown voters are rejected. Regression checks passed: types 149; execution 205; Arc types 5; vault-bridge governed route 15 (2 Anvil tests remain ignored); Cobalt authority kinds 1; FastPay recovery types 9; owned-transfer recovery 11; node FastPay 19; pfUSDC proofs 1; cargo check, formatting, and three documentation gates. Finding 3 (P2) remains open. -
Release merge: This lane opened and merged PR #42 (
integrate/main-into-combined-20260918→release/combined-devnet-20260915, +8,665/−921) with a merge commit at2026-09-18T10:39Z. Resulting release tipd224c0becontains candidate15126ac3, main1a7f7bf1, and both repairs. Subsequent qualification and repair commits brought the release tip toa5b1e757. -
Local qualification: The packet (
10b7b203,e49a2390) uses sourced224c0befor history/service checks and the September 16 packet's method. PASS: six original full-history checks at height 1020, six saved-V2 checks at 1021, six fresh-rotation replays at 1021, local governed rotation in both startup orders with six accepted receipts, convergence and restart, and pre-activation rollback (six old-binary checkpoint/restart checks plus new-binary full replay). Workspace check, formatting, proof-input inventory, FastPay types/execution suites, live-replay supply, three documentation gates, and checksums passed. The full workspace test suite passed in CI for the source tip; node-fastpay and warm-latency were deferred to CI. This is disposable local-copy qualification, not live authority. Copies and logs remain under~/.cache/release-repair-20260918on the server; the memory rule held: one copy at a time, two workers, limits. -
Initial failures closed:
03e422a7fixes the test-only Clippy error at cobalt_handoff.rs:1466; workspace Clippy and all 13 Cobalt handoff tests pass. Two clean release executables initially differed at byte 8703: the ambient Zig linker embedded a build-specific RUNPATH string in.dynstr. Using the September 16 build method, both clean builds ofa5b1e757match at SHA-256051ad12ce22c33f2370388259d754a9c1016a8edc1b52db7d2852fe78f6fbc7d. The packet's README row is PASS; node-builds.json retains the superseded attempt, and SHA256SUMS was regenerated. -
CI and remaining deployment gates: At
2026-09-18T13:04Z,gh run listford224c0beshowed product-security-ci, arc-proof-identities, and docs-build completed successfully; rust-ci completed with failure overall, despite the recorded workspace-test pass. Fora5b1e757, docs-build passed; rust-ci, product-security-ci, and arc-proof-identities were in progress. Still required: fresh green CI ona5b1e757, closure of node-fastpay and warm-latency, classification as test-only of seven reachable-history secret-scan findings in old wallet test files, and the unavailable pinned testnet archive. -
Fleet and activation boundary: The last fleet observation in the September 17 preflight ran from
2026-09-17T11:16:49.908219Zthrough11:32:07.540468Z: all six agreed at height 1020 with empty mempools, and all 12 validator/RPC processes rana666-source-route-20260907, binary57b0f4d1…634eec83, reporting build revision707e006f. See Current State for the deployment baseline. The nine consensus-affecting repairs in the September 16 handoff and today's two P1 repairs are now on the release branch, source-only and not activated. No fresh live probe, fleet mutation, deployment, or restart occurred in this session. No Task Node action. -
Z3: Unchanged since September 17: offline gates done, wallet funded, no integrated live cycle yet. This lane decided to run the first live cycle after deployment, so the sustained window counts on one binary, using the current-v2 Arc pair used on September 2, a per-cycle cap of 2,000,000 USDC atoms, and the latency bounds proposed in the G5 rehearsal review.
Next decision or action¶
This lane's decisions¶
- Close the remaining deployment gates above, obtain an explicit deployment go, and take a fresh read-only fleet observation. Deploy the qualified combined release to all six controlled-devnet validators with pinned source, binary, data, activation, and rollback identities and the written rollback path from the qualification packet. Then take a fresh observation and update the canonical status record.
- Run the first Z3 integrated cycle on the new release (G4), then the sustained window, using the pair, cap, and latency bounds chosen above.
- Address the remaining candidate P2: the Arc finality cursor rejects independent deposits at one height; see the updated review's finding 3.
Only the other lane can provide¶
| Item | First asked (UTC) |
|---|---|
| Height-915 quarantine archive and height-924 custodian authorization; block offline storage qualification A3–A5. | 2026-08-30 |
| AI-governance decision for Gate Zero Z2. | 2026-09-03 |
| Whitepaper abstract-rule decision. | 2026-09-10 |
| StakeHub PR #8 findings decision. | 2026-09-07 |
| Decisions or named live environments for the twelve inventory rows. | 2026-09-10 |
| Who restarted every service on all six validators on September 11, 06:01–06:47Z. | 2026-09-14 |
| Task Node instruction for this lane. | 2026-08-27 |
References¶
- PR #42, draft PR #41, integration branch, qualification packet directory.
- Other lane's last handoff.
- Integration and repairs: 4d0a0b32, 6849d976, 397b4f53, b8b8145d, d224c0be.
- Qualification and closure: 10b7b203, e49a2390, 03e422a7, a5b1e757.