Remediated G4 Qualification Campaign: Executable Plan

Status: Closed — exactly one execution failed; no retry, final report, packet, or qualification Date: 2026-08-29 Planning baseline: main at 24edd8fa; frozen candidate source a92bb085 Predecessors: Final G4 qualification plan (closed, failed — mechanics of this plan follow it), Certified-send eager-index remediation spec (implemented, verified), Storage scaling milestone (governing gates) Key handoffs: Eager-index remediation complete, Final G4 qualification failure

BLUF

The plan's single authorized campaign executed once and failed. All ten selected-redb windows completed 500 valid rounds with literal receipts, six-validator convergence, bounded transactional work, zero full-history reads, and passing vote-lock, certified-send, and timing-coverage gates. However, their checkpoint-bound reports independently recompute to height-5,000/height-50 p95 ratios of 1.403 for consensus and 1.402 for wallet-to-finality, both above the 1.10 limit.

The first legacy height-50 control then completed all 50 raw rounds but failed VOTE_LOCK_MIGRATION_AFTER_FIRST_VALIDATOR_RESERVATION. Four validators migrated their vote-lock index on their second observed reservation. The node's empty-directory path returns without writing the index marker, so the first reservation creates a lock and the next reservation performs migration. The preflight telemetry fixture did not exercise that actual node sequence.

There is no final campaign report or packet. The packager was not invoked. Checkpoint SHA-256 is e33dfdb628563f38d486ace5a3ebc13be280ecea5cb862a8da51627b1c6028a3; the one-diagnosis SHA-256 is e2134a4ea8988ced89e95f601b0cdc0aeaeffe9acd46676976f54adadb60c164. This run cannot be resumed, retried, or relabeled. Storage remains selected but not offline qualified.

Frozen identities

Item Value
Candidate source a92bb085ceb6a9f405e916608e6b7bb6010fcc9b
Candidate binary SHA-256 902773e00e5226dab9e027ebce2b932b2cf26509dba08424f6ebe46db985e182; 51,977,656 bytes; embedded revision a92bb085; profile release
G1 candidate manifest SHA-256 ed66a6375234f64d5aab863bccb6415b07c77fc5a3a028c5a6c2f01f41af0190
G2 safety manifest SHA-256 dd300bcb8130f91ab54e26f969fe7dca37335d99cc5bf4ca78a939a79584d170
Rollback report SHA-256 9c32319693df1f55a6c1ecd75449fe8341d180317e11547c604f135741c3e8a5
Tamper/crash report SHA-256 6b63fe1070a2981e5d2720bf25b3cf3b8ad95beece364d9fd76579f027b146e0
Runner/verifier Branch postfiatchad/corrected-g4-vote-lock-gate at a3c7bea9285ab02871fd2111038764c6174b905b; gate-logic parent 15d059d1; test-only successor
Batch-builder helper Release binary SHA-256 ad70ca685cfaf1d0a67eb80f4805438c0e4363c8957598d1d884abd03690014a; identity smoke a3c7bea9 / release
Frozen fleets Unchanged 5,000-block input prepared by ae658441; the manifest preserves this prepared_by provenance distinction
Prepared-input manifest SHA-256 c9fb32e7c3cebcf2ef16a90843c63dd96b7ed0ebc3c20ce94d2fd21707e7da42
Independent input-verification receipt SHA-256 6848d49d2488cd0730efd14863c5fe446a1f31827cec98346583beee8b9cbb58; all 18 references rehashed
Failed-campaign lineage Both prior private run directories and all closed-failed records preserved untouched; never resumed, retried, or relabeled

The candidate binary must be byte-identical from its G1 record through the end of the campaign. Any node-source change aborts this plan and returns to a new freeze. Runner-only changes remain separately hash-bound; the runner used to measure must be exactly a3c7bea9.

Hard rules (inherited from both predecessor campaign plans — all still bind)

  1. Build and fleet verification outside the four-hour measurement clock.
  2. Unchanged matrix: five selected-redb windows at height 50, five at height 5,000, five legacy-JSONL controls at height 50; 50 finalized rounds per window; six validators; selected windows before legacy controls.
  3. Diagnose once on failure; no retry, no matrix enlargement, no relabeled partial runs; TIME_BUDGET_EXCEEDED is a recorded result.
  4. Offline only: no devnet, deployment, height-924 copy, or live-fleet claims.
  5. Round success = valid certificate + literal matching receipts + six-validator convergence. Never elapsed time alone.
  6. Private run directories contain validator material: never commit, publish, or delete.
  7. Prepared-input derivation and verification are read-only; derivation must not open or mutate candidate state.

Known residual risks (state honestly before the clock starts)

  • Height-5,000 with the certified-send fix is unmeasured in-campaign. The spot check (2.064 ms at the cap, height-flat) predicts passing ratios, but the prior corrected campaign is the only one to complete height-5,000 windows and it predates this fix. A genuine ratio failure here is a real scaling result, not a contract bug, and closes this plan as FAIL.
  • The legacy lane's re-keyed vote-lock migration contract is unproven in-campaign. The corrected campaign's first legacy window failed on the old round-keyed contract; the re-keyed first-use contract passed preflight suites but no legacy window has run since. The legacy windows run last, so a legacy-lane contract failure would strand ten completed selected windows; the checkpoint preserves them as verifiable units either way.
  • Both migration allowances fire inside measurement windows. Vote-lock at each validator's first reservation; certified-send at each validator's first resume — now including empty-index creation for outbox-less validators with all work counters zero. Both are modeled by fixtures on runner a3c7bea9.

Step 0 — Authorization gate

Authorization recorded: on 2026-08-29, the operator directly instructed the executing IC to "do this" plan and named the three governing context documents. That instruction authorizes exactly one run of this plan. Per the operator's standing instruction and the milestone's operations boundary, no Task Node or agent workflow is used. Review and authorization are now complete; measurement may start only after Steps 1 and 2 pass.

Step 1 — Re-verify bound inputs (outside the clock)

The prepared-input manifest c9fb32e7…da42 and independent receipt 6848d49d…bb58 already exist and passed. Before the clock starts:

  • [x] Rehash the candidate binary against 902773e0…e182 and its embedded revision against a92bb085.
  • [x] Confirm the runner worktree is clean at exactly a3c7bea9 and the helper binary rehashes to ad70ca68…014a.
  • [x] Independently reopen the input manifest and rehash all 18 references; any mismatch aborts before measurement with no clock consumed.

Completed: all source, binary, manifest, runner, helper, and receipt identities match the frozen table. The candidate and helper binaries contain their expected embedded revisions. A fresh independent read-only pass rehashed all 18 input references successfully. The intended output path remained absent.

Step 2 — Preflight the migration allowances (outside the clock)

  • [x] Run the full runner/packager/verifier suite at a3c7bea9 (96 tests) and confirm it includes: vote-lock first-use, certified-send first-use with a populated outbox, certified-send first-use with no outbox (empty-index migration, zero counters), the no-outbox→deliveries→second-resume sequence, repeated-migration rejection, and late-migration rejection.
  • [x] Run the focused node suites (completed_index_tests, certified_send) once against the frozen source to confirm the working tree still matches the freeze.
  • [ ] Retrospective FAIL: exercise the exact portable-snapshot legacy node sequence. The preflight fixture modeled accepted per-validator telemetry, but did not execute empty vote-lock directory → first durable lock → second reservation against the candidate.

Recorded preflight result: the runner, packager, and verifier suite passed 96 tests in 22.556 seconds; the frozen candidate passed 15 completed-index tests and 35 certified-send tests, with only the intentional manual release spot check ignored in each node suite. Both source and runner worktrees remained clean. The campaign proved this coverage was insufficient: the claimed portable-restore contract was not exercised end to end.

Step 3 — Campaign result

Exactly one campaign ran in the fresh private directory ~/repos/postfiat-storage-g4-measurement-a3c7bea9-a92bb085-v1. The four-hour measurement clock started at 2026-08-29T14:44:45Z; the campaign failed at 2026-08-29T15:18:44Z after 2,038.594669 seconds, well inside the budget.

Ten selected units completed: five height-50 windows and five height-5,000 windows, 50 finalized rounds each. The first legacy height-50 unit completed its 50 raw rounds, then failed its vote-lock work gate. The checkpoint status is FAILED, final_report_sha256 is null, and no campaign process survives. The packager was not invoked.

Failure artifact SHA-256
Campaign checkpoint e33dfdb628563f38d486ace5a3ebc13be280ecea5cb862a8da51627b1c6028a3
Failed legacy raw report 379a7b2630925b529ef55f727f92f38d32cfa49f3466f286e9fef12ab4815790
Failed legacy vote-lock receipt 4f3ad65296946d28bebd9a1ae88eb472ba92141deda5bb1b1bcacddb18cb4327
One diagnosis e2134a4ea8988ced89e95f601b0cdc0aeaeffe9acd46676976f54adadb60c164

Step 4 — Pass/fail gates

The candidate qualifies only if every row holds. Unavailable rows are never passes.

Gate Threshold Result
Height-5,000/height-50 consensus_round_ms p95 ratio ≤ 1.10 FAIL — 405.759 ms → 569.129 ms; ratio 1.402629, recomputed from the ten completed selected windows
Height-5,000/height-50 wallet_to_finality_ms p95 ratio ≤ 1.10 FAIL — 418.215 ms → 586.163 ms; ratio 1.401582, recomputed from the ten completed selected windows
No material positive height relationship in synchronous stages Required PASS for the ten completed selected windows — every named-stage model reports false; no final campaign report exists
Round-coverage residual gate Every measured round; residual < 100 ms Unavailable overall — all 500 selected rounds pass, max 79.619 ms; the failed legacy report independently recomputes to 50/50 pass, max 66.968 ms, but its receipt was not emitted before the vote-lock stop
Selected/legacy height-50 comparison All five legacy windows complete and compare FAIL / unavailable — only the first legacy window ran, and it failed before becoming a completed unit
Literal receipts, six-validator convergence, bounded redb work, zero full-history reads Every round Unavailable overall — all ten selected windows pass; the raw legacy benchmark passes 50 rounds, but the campaign stopped before all 15 units
Vote-lock bounded-work and migration-position gate First-reservation only; ≤2 files / ≤314 bytes ordinary votes FAIL — validators 0, 1, 2, and 5 migrated in round 2 on reservation observation 2; four files / 866 bytes each
Certified-send bounded-work and migration-position gate First-resume only, including zero-work empty-index migrations; validated == compacted + pruned on ordinary resumes Unavailable overall — all ten selected windows pass; the failed legacy report independently recomputes to pass, but no receipt was emitted before the vote-lock stop
Four-hour measurement budget Not exceeded PASS — 2,038.595 / 14,400 seconds

The ratio and named-stage entries are exact artifact-based recomputations using the frozen runner's own aggregation functions. They are not a substitute for the absent final campaign report and are not packet evidence.

Step 5 — Recorded outcome

FAIL; no retry authorized. The process stopped at the first legacy vote-lock work gate. crates/node/src/vote_locks.rs:193-260 owns the failed node behavior: when the vote-lock directory is empty, migration returns without writing the marker. The first reservation then writes a lock; the next reservation migrates it. The locked runner correctly rejects migration after the validator's first observed reservation.

The preflight gap is equally specific: its telemetry fixture represented first-use and late-use results, but did not execute the candidate's exact empty-directory → first lock → second reservation sequence on the portable legacy restore. A future remediation needs an owner-level node fixture and an end-to-end portable-restore fixture for that sequence.

Separately, the completed selected data misses both scaling-ratio limits. A future proposal must address both the vote-lock marker contract and the selected-window latency tail. No source change, new freeze, or new campaign is authorized by this failure closure. G3 remains open; G5, deployment, and public testnet remain blocked.

Explicit non-goals

  • No devnet contact, deployment, or live-fleet claims.
  • No height-924 copy (G3 authorization is separate; do not wait idle for it).
  • No candidate source changes after the freeze.
  • No reuse of either prior failed campaign's receipts as fresh evidence.
  • No second campaign under this plan, pass or fail.
  • No G5 packet assembly from private raw output; packaging authority stays with package_packet.py on a passing report only.
  • The two untracked docs/security/ auditor inventories remain untouched.

Exit criteria

  • [x] This plan reviewed; one run explicitly authorized and recorded by the operator's direct 2026-08-29 instruction.
  • [x] Step-1 identity re-verification passed outside the clock.
  • [ ] Step-2's focused suites passed outside the clock, but the claimed exact legacy-lane vote-lock sequence was not actually covered; the campaign exposed this retrospective preflight failure.
  • [x] Exactly one campaign executed under one fresh four-hour clock.
  • [x] Full gate table reported truthfully with all identities.
  • [x] Milestone and handoff updated; exactly one named-stage diagnosis recorded, then stopped without candidate change, packaging, or retry.