Remediated G4 qualification failure¶
- Operator: Post Fiat (
postfiatchad) - Date: 2026-08-29 UTC
BLUF¶
The single campaign authorized by the
remediated G4 plan
ran once and failed. All ten selected-redb windows completed and passed
their per-window correctness and bounded-work gates, but their bound reports
miss both 1.10 height-ratio limits at 1.402629 and 1.401582. The first
legacy control then failed the vote-lock migration-position gate because four
validators migrated on their second observed reservation. No final report or
packet exists, the packager was not invoked, and no retry is authorized. The
storage milestone is updated with
the complete result.
Current state¶
Exact campaign result¶
| Boundary | Recorded fact |
|---|---|
| Candidate source | a92bb085ceb6a9f405e916608e6b7bb6010fcc9b |
| Candidate binary | SHA-256 902773e00e5226dab9e027ebce2b932b2cf26509dba08424f6ebe46db985e182 |
| G1 / G2 | ed66a6375234f64d5aab863bccb6415b07c77fc5a3a028c5a6c2f01f41af0190 / dd300bcb8130f91ab54e26f969fe7dca37335d99cc5bf4ca78a939a79584d170 |
| Runner | a3c7bea9285ab02871fd2111038764c6174b905b on postfiatchad/corrected-g4-vote-lock-gate |
| Helper | SHA-256 ad70ca685cfaf1d0a67eb80f4805438c0e4363c8957598d1d884abd03690014a |
| Prepared input / verification | c9fb32e7c3cebcf2ef16a90843c63dd96b7ed0ebc3c20ce94d2fd21707e7da42 / 6848d49d2488cd0730efd14863c5fe446a1f31827cec98346583beee8b9cbb58 |
| Measurement clock | 2026-08-29T14:44:45Z to 2026-08-29T15:18:44Z; 2,038.594669 / 14,400 seconds |
| Matrix reached | Ten selected windows complete: 5 × height 50 and 5 × height 5,000, 50 rounds each; first legacy height-50 window ran 50 raw rounds and then failed its gate |
| Failed unit | legacy-jsonl/height-50-window-1 |
| Reason | VOTE_LOCK_MIGRATION_AFTER_FIRST_VALIDATOR_RESERVATION |
| Final report / packet | None / none; packager not invoked |
| Campaign rule | One run consumed; no resume, retry, relabeling, or packaging |
The private output is
~/repos/postfiat-storage-g4-measurement-a3c7bea9-a92bb085-v1. Preserve it;
do not commit, publish, delete, or treat it as redaction-safe packet material.
| Private failure artifact | SHA-256 |
|---|---|
campaign-checkpoint.json |
e33dfdb628563f38d486ace5a3ebc13be280ecea5cb862a8da51627b1c6028a3 |
| Failed legacy raw report | 379a7b2630925b529ef55f727f92f38d32cfa49f3466f286e9fef12ab4815790 |
| Failed legacy vote-lock receipt | 4f3ad65296946d28bebd9a1ae88eb472ba92141deda5bb1b1bcacddb18cb4327 |
| One diagnosis | e2134a4ea8988ced89e95f601b0cdc0aeaeffe9acd46676976f54adadb60c164 |
Gate table¶
| Gate | Result |
|---|---|
| Consensus p95 height ratio | FAIL — 405.759 ms at height 50; 569.129 ms at height 5,000; ratio 1.402629 |
| Wallet-to-finality p95 height ratio | FAIL — 418.215 ms at height 50; 586.163 ms at height 5,000; ratio 1.401582 |
| Named synchronous-stage height model | PASS for the ten selected windows; no stage reports a material positive linear relationship |
| Round coverage | All 500 selected rounds pass, max residual 79.619 ms; failed legacy report independently recomputes to 50/50 pass, max 66.968 ms, but no receipt was emitted before the vote-lock stop |
| Selected/legacy height-50 comparison | Unavailable / fail — only one legacy window ran and it failed before becoming a completed unit |
| Selected correctness and storage work | PASS for all ten selected windows: literal receipts, six-validator convergence, bounded redb work, zero full-history reads |
| Vote-lock work | FAIL in first legacy window |
| Certified-send work | All ten selected windows pass; failed legacy report independently recomputes to pass, but no receipt was emitted before the vote-lock stop |
| Time budget | PASS — not exceeded |
| Overall | FAIL |
The ratio and named-stage values are exact recomputations from the ten checkpoint-bound normalized reports using the frozen runner's aggregation functions. They are diagnostics, not a fabricated final campaign report.
What failed and why¶
The immediate stop is node-owned in
crates/node/src/vote_locks.rs:193-260. When the vote-lock directory contains
no JSON locks, migrate_block_proposal_vote_locks returns without writing the
durable index marker. The first reservation then creates a lock. A later
reservation sees that lock and performs migration.
In the failed legacy window, validators 0, 1, 2, and 5 each migrated in
finalized round 2 on their second observed reservation, examining four files
and 866 bytes. Validator 3 migrated in round 2 on its first observed
reservation and passed; validator 4 had no observed migration. The runner at
benchmarks/storage-scaling/run_campaign.py:962-1107 correctly rejected the
four late migrations.
The preflight claim was too strong. Its fixture modeled first-use and late-use telemetry, but did not execute the candidate's exact empty-directory → first lock → second reservation sequence against a portable legacy restore. The plan now records that retrospective preflight failure.
There is also an independent selected-path problem: even though every selected window passed its local gates, the aggregate p95 height ratios are about 1.40. Therefore an eager vote-lock marker fix alone cannot make this frozen result pass.
Repository and operational boundaries¶
- The repository was on
mainat pushedc84083fbwhen the run began. The closure documents are a docs-only successor; runtime source remains the frozena92bb085candidate. - The main worktree's two unrelated untracked auditor inventories under
docs/security/were preserved untouched and unstaged. - The runner and candidate source worktrees remain clean at their frozen revisions.
- No Task Node, agents, devnet, fleet, service, deployment, validator-copy, or height-924 action occurred.
- No live probe was performed. This handoff makes no new claim about the controlled devnet; see Current State.
- Storage remains selected, not offline qualified. G3, G4, G5, deployment, and public testnet remain blocked.
Next decision or action¶
Do not restart this campaign.
If Post Fiat chooses to continue storage qualification, the next bounded work must be a new reviewed remediation, not another run. It must:
- lock the intended empty-directory vote-lock marker contract and add both a node-owner fixture and the exact portable-restore end-to-end fixture;
- explain and remediate the selected-window p95 tail that produces the two ~1.40 height ratios;
- refresh every affected source, binary, G1/G2, runner, helper, and prepared- input binding; and
- obtain separate authorization for exactly one new campaign.
G3 exact replay can remain a separate track, but height 924 still needs a named custodian and separate read-only copy authorization. Do not wait idle for it. No G5 packaging, G6 rehearsal, deployment, or public-testnet claim is allowed until a future G4 passes and all other gates close.