Skip to content

Devnet storage rollout stopped at G6

Date: 2026-08-30

Superseded operationally: successor 10dd9f20 later repaired this continuation defect, but its live canary failed on a separate deployment topology gap and was rolled back. Continue with the canary rollback handoff.

Result

STOP — d0ae79f3 is not clone-qualified and was not deployed.

The preflight fleet probe found all six validators converged at height 924 with empty mempools, identical deployed binary d5e5ef63…c2696caf, Cobalt authority mode 1, identical registry/trust roots, and active validator/RPC/shadow services.

The exact height-924 G6 run then:

  • authenticated six distinct stopped validator clones;
  • rebuilt six transactional generations and passed six independent verify-only checks with packet root 6a6b53ea…e4807d5; and
  • failed closed on the first certified height-925 transfer round because validator-1 rejected all three deliveries with live validator registry activation previous validator registry root mismatch.

The clones remained at height 924. No live binary, service, data directory, storage mode, governance state, or Cobalt authority was changed. A post-failure probe confirmed the live fleet was unchanged, so rollback was unnecessary and Z1 did not start.

Evidence

  • G6 rehearsal stop report
  • benchmarks/storage-scaling/devnet-rollout/fleet-probe-20260830.json
  • benchmarks/storage-scaling/devnet-rollout/g6-failure-20260830.json
  • benchmarks/storage-scaling/devnet-rollout/stop-receipt-20260830.json
  • docs/plans/active/devnet-storage-rollout-plan.md
  • docs/status/chain-state-current.md

Raw clones, signer material, logs, and the partially completed rehearsal remain private under ~/.postfiat/deployments/storage-rollout-d0ae79f3/ and must not be committed or published.

Next gate

Repair the owning validator-registry continuation logic so an already-applied, superseded update is not treated as due again. Add an exact two-update height-924-to-925 regression, then repeat every invalidated candidate qualification gate and G6 under a new source/binary identity. A new written deployment decision is required after that pass.